>

Solid Waste Processing Plant

Solid Waste Processing Plant
Client: Metro Waste Management
Location: Toronto, Canada
Industry: Environmental Services

Description

Metro Waste Management selected CoreFlow EPC to design and construct a state-of-the-art solid waste processing facility incorporating advanced sorting, recycling, and energy recovery technologies to achieve zero-landfill goals.

Processing Capacity:

  • 500 tonnes per day municipal solid waste
  • Automated sorting and separation systems
  • Material recovery facility (MRF)
  • Refuse-derived fuel (RDF) production

Technology Integration:

  • AI-powered optical sorting systems
  • Magnetic and eddy current separators
  • Ballistic separation technology
  • Quality control and contamination detection

Sustainability Results: The facility achieves 85% waste diversion from landfills, produces 50 MWh of renewable energy daily, and creates 75 local jobs while reducing municipal waste management costs by 40%.

0

Comments:

No comments yet. Be the first to comment!

Log in to leave a comment