Solid Waste Processing Plant
Client:
Metro Waste Management
Location:
Toronto, Canada
Industry:
Environmental Services
Description
Metro Waste Management selected CoreFlow EPC to design and construct a state-of-the-art solid waste processing facility incorporating advanced sorting, recycling, and energy recovery technologies to achieve zero-landfill goals.
Processing Capacity:
- 500 tonnes per day municipal solid waste
- Automated sorting and separation systems
- Material recovery facility (MRF)
- Refuse-derived fuel (RDF) production
Technology Integration:
- AI-powered optical sorting systems
- Magnetic and eddy current separators
- Ballistic separation technology
- Quality control and contamination detection
Sustainability Results: The facility achieves 85% waste diversion from landfills, produces 50 MWh of renewable energy daily, and creates 75 local jobs while reducing municipal waste management costs by 40%.
0
Comments:
No comments yet. Be the first to comment!
Log in to leave a comment